Yesterday we were able to hang the freshly detailed engine on the aircraft. The installation went without a hitch and now the engine is ready for final assembly with installation of the baffles, rocker covers, and chrome push rod tubes.
Ray putting the finishing touches on the engine mount ring. All new rubber pads were used in the installation.
Engine has an acrylic gloss black on the case and high temp black on the cylinders.
We expect the push rod tubes back from chrome at the end of the week, so the engine should be complete in a week or so.
No comments:
Post a Comment